Monday, June 2, 2014

Temporary Closure Notice 9th June - Doddington and Islip Lock

There will be a power outage at the above locks on Monday 9th June between 8.30 and 15.30 while works are carried out.  The locks will be inoperable during this time period.

Issued by the EA on 2nd June

Upstream Landing Stage - Warmington Lock

The upstream landing stage at Warmington has been damaged.  Please refrain from using the area highlighted with yellow marker paint.

Issued by the EA on 2/06/14